Day 78 - 5/22/12

Well, I got a little tired of the intense grinding, so we moved in another direction. The entire brake system and the front bearings need to be repacked, so we started on that. Today's Tuesday, so hopefully we'll be done this weekend.

Step one, jacker up!

The calipers where a little sticky, but they are the brakes so that made sense why.

Hopefully we can reuse the rotors and calipers, they seem to be in decent condition.

Got the bearings out, and they look great! The spindles look beautiful as well.

Both sides are in great condition for 40 years old!

I scooped out the majority of the grease out of the rotors, and then used our handy solvent tank to let every thing soak.

Last thing we did today was drain the master cylinder and remove it.

No comments:

Post a Comment